Case Study

Kier Highways, Strensham, New Build Depot

  • Client Kier Highways
  • Location Strensham
  • Commercial
  • Industrial
The Problem

The Highways England and Kier Highways team have made ongoing commitments to improve the Road Network Strategy across all of Area 9. With an increase in staff and resource additional office space and upgrades are a familiar requirement across their Midlands depots 

Our works included all lighting, small power, ventilation, air conditioning, distribution of services and testing and commissioning throughout the building.  

In specialist areas we were responsible for door access control systems, installation of mechanical items such as sinks, showers and associated pipework. 

Other specialist items included generator relocation, air handling unit reconfiguration, ductwork alterations and small associated building works to working areas. 

All areas were tested and certified post completion of works and have since been verified by the ECA as a project of good practice. 

The Client

SOLJET were the approved M&E contractor facilitating works on a New Kier Highways Depot at Strensham, Worcester.

“The work that Soljet completed on site was first class. Their commitment to getting the project complete on time and to the highest standards was clear to see. The end product was far beyond our original expectations” Matt Wham Quantity Surveyor, Kier Highways

We ensure our clients receive the best solutions to their construction needs by offering the latest methods, ideas and products through our innovative project delivery.